Cost of Two New Metro Rail Lines Expected to More Than Double Previous Estimates
The construction cost for two new metro rail lines in the capital is projected to be more than double the previous estimates. On the Uttara–Motijheel line, the average cost per kilometer was 15.74 billion BDT, whereas for MRT Line-1 and Line-5 (North), the potential cost is projected at 36.18 billion BDT per kilometer. According to contractor proposals, the total cost could reach around 1.845 trillion BDT, nearly twice the approved budget.